Part finder/Single FETs, MOSFETs/C060SCM12033B1
Single FETs, MOSFETs
Sourcing quote available
C060SCM12033B1 by Cactus Materials Inc.

C060SCM12033B1

Cactus Materials Inc.

SiC MOSFET 33A 1200V TO-247-4

TO-247-4L Unknown Date-code options
MANUFACTURERCactus Materials Inc.
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

SiC MOSFET 33A 1200V TO-247-4 The C060SCM12033B1 from Cactus Materials Inc. is listed under Single FETs, MOSFETs with TO-247-4L packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

21 verified engineering parameters recorded
Case/PackageTO-247-4L
MountThrough Hole
Supplier Device PackageTO-247-4L
Current - Continuous Drain (Id) @ 25°C33A
Drain to Source Voltage (Vdss)1200 V
Drive Voltage (Max Rds On, Min Rds On)15V, 20V
FET Feature-
FET TypeN-Channel
Gate Charge (Qg) (Max) @ Vgs90 nC @ 18 V
Grade-
Input Capacitance (Ciss) (Max) @ Vds930 pF @ 1000 V
Operating Temperature175°C (TJ)
Power Dissipation (Max)135W
Product StatusActive
Qualification-
Rds On (Max) @ Id, Vgs70mOhm @ 10A, 20V
Series-
TechnologySiCFET (Silicon Carbide)
Vgs (Max)+20V, -5V
Vgs(th) (Max) @ Id2.9V @ 10mA
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about C060SCM12033B1

What is C060SCM12033B1 used for?

SiC MOSFET 33A 1200V TO-247-4 Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.