Part finder/Real Time Clocks/CBC92141C-Q3-TR3
Real Time Clocks
Sourcing quote available

CBC92141C-Q3-TR3

Cymbet Corporation

Real Time Clock (RTC) IC Clock/Calendar 64B I2C 16-UFQFN Exposed Pad

16-UFQFN Exposed Pad Unknown Date-code options
MANUFACTURERCymbet Corporation
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

Real Time Clock (RTC) IC Clock/Calendar 64B I2C 16-UFQFN Exposed Pad The CBC92141C-Q3-TR3 from Cymbet Corporation is listed under Real Time Clocks with 16-UFQFN Exposed Pad packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

14 verified engineering parameters recorded
Mounting TypeSurface Mount
Package / Case16-UFQFN Exposed Pad
Supplier Device Package16-MLPQ (3x3)
Date FormatYY-MM-DD-dd
Time FormatHH:MM:SS:hh (12/24 hr)
Voltage - Supply2.5V ~ 5.5V
TypeClock/Calendar
Memory Size64B
InterfaceI2C
Operating Temperature-40°C ~ 85°C
FeaturesAlarm, Backup Supply Charger, Leap Year, RAM
Voltage - Supply, Battery4.1V
Current - Timekeeping (Max)0.06µA @ 2.5V ~ 5.5V
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about CBC92141C-Q3-TR3

What is CBC92141C-Q3-TR3 used for?

Real Time Clock (RTC) IC Clock/Calendar 64B I2C 16-UFQFN Exposed Pad Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.