Part finder/Single FETs, MOSFETs/MOT65R099KN
Single FETs, MOSFETs
Sourcing quote available

MOT65R099KN

Guangdong Inmark Electronics Co., Ltd.

MOSFET N-CH 650V 40A 0.099 To-24

- Unknown Date-code options
MANUFACTURERGuangdong Inmark Electronics Co., Ltd.
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

MOSFET N-CH 650V 40A 0.099 To-24 The MOT65R099KN from Guangdong Inmark Electronics Co., Ltd. is listed under Single FETs, MOSFETs with - packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

21 verified engineering parameters recorded
Case/Package-
MountThrough Hole
Supplier Device PackageTO-247
Current - Continuous Drain (Id) @ 25°C40A
Drain to Source Voltage (Vdss)650 V
Drive Voltage (Max Rds On, Min Rds On)-
FET Feature-
FET TypeN-Channel
Gate Charge (Qg) (Max) @ Vgs70 nC @ 10 V
Grade-
Input Capacitance (Ciss) (Max) @ Vds2000 pF @ 25 V
Operating Temperature-40°C ~ 150°C (TJ)
Power Dissipation (Max)357W
Product StatusActive
Qualification-
Rds On (Max) @ Id, Vgs99mOhm @ 20A, 10V
Series-
TechnologyMOSFET (Metal Oxide)
Vgs (Max)±30V
Vgs(th) (Max) @ Id4.5V @ 250µA
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about MOT65R099KN

What is MOT65R099KN used for?

MOSFET N-CH 650V 40A 0.099 To-24 Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.