Part finder/Single Board Computers (SBCs)/IEC-EDGE2-0216
Single Board Computers (SBCs)
Sourcing quote available
IEC-EDGE2-0216 by Mixtile Limited

IEC-EDGE2-0216

Mixtile Limited

SBC 2.0GHZ 4 CORE 2GB RAM

See datasheet Unknown Date-code options
MANUFACTURERMixtile Limited
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

SBC 2.0GHZ 4 CORE 2GB RAM The IEC-EDGE2-0216 from Mixtile Limited is listed under Single Board Computers (SBCs) with See datasheet packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

22 verified engineering parameters recorded
Analog Input:Output4
Contents-
Cooling TypeHeat Sink
Core ProcessorRockchip RK3568, Quad-Core-A55
Digital I/O Lines4
EthernetGbE (2)
Expansion Site/BusADC, CAN, I2C, RS-485, SPDIF, UART
Form FactorDesktop
Number of Cores4
Operating Temperature0°C ~ 80°C
Power (Watts)10W
Product StatusActive
RAM Capacity/Installed2GB
RS-232 (422, 485)-
Series-
Size / Dimension5.827" x 4.134" (148.00mm x 105.00mm)
Speed2GHz
Storage InterfaceeMMC 5.1
USBUSB 3.0 (3)
Video OutputsHDMI 2.0
Watchdog TimerYes
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about IEC-EDGE2-0216

What is IEC-EDGE2-0216 used for?

SBC 2.0GHZ 4 CORE 2GB RAM Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.