Part finder/DC DC Converters/MI-J20-MY-B1
DC DC Converters
Sourcing quote available
MI-J20-MY-B1 by Northwest Power Inc.

MI-J20-MY-B1

Northwest Power Inc.

DC DC CONVERTER 50W

Half Brick Unknown Date-code options
MANUFACTURERNorthwest Power Inc.
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

DC DC CONVERTER 50W The MI-J20-MY-B1 from Northwest Power Inc. is listed under DC DC Converters with Half Brick packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

26 verified engineering parameters recorded
Case/PackageHalf Brick
MountThrough Hole
Supplier Device PackageHalf Brick
ApplicationsITE (Commercial)
Approval AgencyCE
Control Features-
Current - Output (Max)10A
Efficiency90%
FeaturesBaseplate, Remote Sense
Grade-
Number of Outputs1
Operating Temperature-55°C ~ 100°C
Power (Watts)50 W
Product StatusActive
Qualification-
Size / Dimension2.40" L x 2.28" W x 0.50" H (61.0mm x 57.9mm x 12.7mm)
Standard Number-
TypeIsolated Module
Voltage - Input (Max)50V
Voltage - Input (Min)18V
Voltage - Isolation3 kV
Voltage - Output 15V
Voltage - Output 2-
Voltage - Output 3-
Voltage - Output 4-
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about MI-J20-MY-B1

What is MI-J20-MY-B1 used for?

DC DC CONVERTER 50W Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.