Part finder/Transistor, Photovoltaic Output Optoisolators/MCT4R
Transistor, Photovoltaic Output Optoisolators
Sourcing quote available
MCT4R by onsemi

MCT4R

onsemi

OPTOISOLATOR 1KV 1CH TRANS TO-18

TO-206AA, TO-18-3 Metal Can Unknown Date-code options
MANUFACTURERonsemi
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

OPTOISOLATOR 1KV 1CH TRANS TO-18 The MCT4R from onsemi is listed under Transistor, Photovoltaic Output Optoisolators with TO-206AA, TO-18-3 Metal Can packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

22 verified engineering parameters recorded
Case/PackageTO-206AA, TO-18-3 Metal Can
MountThrough Hole
Supplier Device PackageTO-18
Current - DC Forward (If) (Max)40 mA
Current - Output / Channel-
Current Transfer Ratio (Max)-
Current Transfer Ratio (Min)15% @ 10mA
Grade-
Input TypeDC
Number of Channels1
Operating Temperature-55°C ~ 125°C
Output TypeTransistor
Product StatusObsolete
Qualification-
Rise / Fall Time (Typ)-
Series-
Turn On / Turn Off Time (Typ)-
Vce Saturation (Max)500mV
Voltage - Forward (Vf) (Typ)1.3V
Voltage - Isolation1000VDC
Voltage - Output (Max)30V
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about MCT4R

What is MCT4R used for?

OPTOISOLATOR 1KV 1CH TRANS TO-18 Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.