Part finder/Transistor, Photovoltaic Output Optoisolators/APV2121SZ
Transistor, Photovoltaic Output Optoisolators
Sourcing quote available

APV2121SZ

Panasonic Electric Works

OPTOISO 2.5KV 1CH PHVOLT 4-SOP

4-SMD, Gull Wing Unknown Date-code options
MANUFACTURERPanasonic Electric Works
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

OPTOISO 2.5KV 1CH PHVOLT 4-SOP The APV2121SZ from Panasonic Electric Works is listed under Transistor, Photovoltaic Output Optoisolators with 4-SMD, Gull Wing packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

22 verified engineering parameters recorded
Case/Package4-SMD, Gull Wing
MountSurface Mount
Supplier Device Package4-SOP
Current - DC Forward (If) (Max)50 mA
Current - Output / Channel8µA
Current Transfer Ratio (Max)-
Current Transfer Ratio (Min)-
Grade-
Input TypeDC
Number of Channels1
Operating Temperature-40°C ~ 85°C
Output TypePhotovoltaic
Product StatusActive
Qualification-
Rise / Fall Time (Typ)-
Series-
Turn On / Turn Off Time (Typ)800µs, 100µs
Vce Saturation (Max)-
Voltage - Forward (Vf) (Typ)1.15V
Voltage - Isolation2500Vrms
Voltage - Output (Max)8.2V
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about APV2121SZ

What is APV2121SZ used for?

OPTOISO 2.5KV 1CH PHVOLT 4-SOP Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.