Part finder/Single FETs, MOSFETs/RM30N100LD
Single FETs, MOSFETs
Sourcing quote available
RM30N100LD by Rectron USA

RM30N100LD

Rectron USA

MOSFET N-CH 100V 30A TO252-2

TO-252-3, DPAK (2 Leads + Tab), SC-63 Unknown Date-code options
MANUFACTURERRectron USA
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

MOSFET N-CH 100V 30A TO252-2 The RM30N100LD from Rectron USA is listed under Single FETs, MOSFETs with TO-252-3, DPAK (2 Leads + Tab), SC-63 packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

21 verified engineering parameters recorded
Case/PackageTO-252-3, DPAK (2 Leads + Tab), SC-63
MountSurface Mount
Supplier Device PackageTO-252-2
Current - Continuous Drain (Id) @ 25°C30A (Tc)
Drain to Source Voltage (Vdss)100 V
Drive Voltage (Max Rds On, Min Rds On)10V
FET Feature-
FET TypeN-Channel
Gate Charge (Qg) (Max) @ Vgs-
Grade-
Input Capacitance (Ciss) (Max) @ Vds2000 pF @ 25 V
Operating Temperature-55°C ~ 175°C (TJ)
Power Dissipation (Max)85W (Tc)
Product StatusActive
Qualification-
Rds On (Max) @ Id, Vgs31mOhm @ 10A, 10V
Series-
TechnologyMOSFET (Metal Oxide)
Vgs (Max)±20V
Vgs(th) (Max) @ Id2.5V @ 250µA
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about RM30N100LD

What is RM30N100LD used for?

MOSFET N-CH 100V 30A TO252-2 Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.