Part finder/Aluminum - Polymer Capacitors/80CZH47M10X9
Aluminum - Polymer Capacitors
Sourcing quote available

80CZH47M10X9

Rubycon

47 µF 80 V Aluminum - Polymer Capacitors Radial, Can 40mOhm 4000 Hrs @ 135°C

Radial, Can Active Date-code options
MANUFACTURERRubycon
AVAILABILITYRequest to verify
LIFECYCLEActive
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

47 µF 80 V Aluminum - Polymer Capacitors Radial, Can 40mOhm 4000 Hrs @ 135°C The 80CZH47M10X9 from Rubycon is listed under Aluminum - Polymer Capacitors with Radial, Can packaging and a active lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

18 verified engineering parameters recorded
SeriesCZH
Capacitance47 µF
Voltage - Rated80 V
Operating Temperature-55°C ~ 135°C
Tolerance±20%
TypeHybrid
Lifetime @ Temp4000 Hrs @ 135°C
ESR (Equivalent Series Resistance)40mOhm
ApplicationsAutomotive
RatingsAEC-Q200
Ripple Current @ High Frequency2.2 A @ 100 kHz
Ripple Current @ Low Frequency330 mA @ 100 Hz
Mounting TypeThrough Hole
Size / Dimension0.394" Dia (10.00mm)
Height - Seated (Max)0.413" (10.50mm)
Package / CaseRadial, Can
Lead Spacing0.197" (5.00mm)
LifecycleActive
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about 80CZH47M10X9

What is 80CZH47M10X9 used for?

47 µF 80 V Aluminum - Polymer Capacitors Radial, Can 40mOhm 4000 Hrs @ 135°C Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Active. Verification happens against the specific sourcing request.