Part finder/Real Time Clocks/10079
Real Time Clocks
Sourcing quote available

10079

SparkFun Electronics

Real Time Clock (RTC) IC Clock/Calendar 256B SPI 20-SOIC (0.295", 7.50mm Width)

20-SOIC (0.295", 7.50mm Width) Active Date-code options
MANUFACTURERSparkFun Electronics
AVAILABILITYRequest to verify
LIFECYCLEActive
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

Real Time Clock (RTC) IC Clock/Calendar 256B SPI 20-SOIC (0.295", 7.50mm Width) The 10079 from SparkFun Electronics is listed under Real Time Clocks with 20-SOIC (0.295", 7.50mm Width) packaging and a active lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

14 verified engineering parameters recorded
Mounting TypeSurface Mount
Package / Case20-SOIC (0.295", 7.50mm Width)
Supplier Device Package20-SOIC
Date FormatYY-MM-DD
Time FormatHH:MM:SS (12/24 hr)
Voltage - Supply2V ~ 5.5V
TypeClock/Calendar
Memory Size256B
InterfaceSPI
Operating Temperature0°C ~ 70°C (TA)
FeaturesAlarm, Leap Year, Square Wave Output, SRAM
Voltage - Supply, Battery2V ~ 3.8V
Current - Timekeeping (Max)120µA ~ 160µA @ 3.63V ~ 5.5V
LifecycleActive
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about 10079

What is 10079 used for?

Real Time Clock (RTC) IC Clock/Calendar 256B SPI 20-SOIC (0.295", 7.50mm Width) Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Active. Verification happens against the specific sourcing request.