Part finder/DC DC Converters/EPM0310SJ
DC DC Converters
Sourcing quote available
EPM0310SJ by Tamura

EPM0310SJ

Tamura

DC DC CONVERTER 3.3V 3W

14-DIP Module Unknown Date-code options
MANUFACTURERTamura
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

DC DC CONVERTER 3.3V 3W The EPM0310SJ from Tamura is listed under DC DC Converters with 14-DIP Module packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

26 verified engineering parameters recorded
Case/Package14-DIP Module
MountThrough Hole
Supplier Device Package-
ApplicationsITE (Commercial)
Approval Agency-
Control Features-
Current - Output (Max)1A
Efficiency70%
FeaturesOCP, OTP, OVP
Grade-
Number of Outputs1
Operating Temperature-20°C ~ 80°C
Power (Watts)3 W
Product StatusActive
Qualification-
Size / Dimension1.30" L x 1.22" W x 0.81" H (33.0mm x 31.0mm x 20.7mm)
Standard Number-
TypeIsolated Module
Voltage - Input (Max)450V
Voltage - Input (Min)110V
Voltage - Isolation3 kV
Voltage - Output 13.3V
Voltage - Output 2-
Voltage - Output 3-
Voltage - Output 4-
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about EPM0310SJ

What is EPM0310SJ used for?

DC DC CONVERTER 3.3V 3W Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.