Part finder/RF Antennas/PR1ICC60
RF Antennas
Sourcing quote available

PR1ICC60

Teltonika

OUTDOOR LTE/WI-FI/GPS ANTENNA

See datasheet Unknown Date-code options
MANUFACTURERTeltonika
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

OUTDOOR LTE/WI-FI/GPS ANTENNA The PR1ICC60 from Teltonika is listed under RF Antennas with See datasheet packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

21 verified engineering parameters recorded
MountBracket Mount
Antenna TypeModule
ApplicationsGPS, LTE, Wi-Fi
Features-
Frequency (Center/Band)788.5MHz, 1.585GHz, 2.2GHz, 2.45GHz, 3.8GHz, 5.35GHz
Frequency GroupWide Band
Frequency Range617MHz ~ 960MHz, 1.56GHz ~ 1.61GHz, 1.7GHz ~ 2.5GHz, 2.4GHz ~ 2.7GHz, 3.3GHz ~ 4.3GHz, 4.7GHz ~ 6GHz
Gain4.5dBi, 28dBi, 4.5dBi, 7.5dBi, 4.5dBi, 7.5dBi
Grade-
Height (Max)9.449" (240.00mm)
Ingress ProtectionIP67
Number of Bands6
Power - Max-
Product StatusActive
Qualification-
RF Family/StandardCellular, Navigation, WiFi
Return Loss-
Series-
TerminationRP-SMA Male (2), SMA Male (3)
VSWR2, 2.5
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about PR1ICC60

What is PR1ICC60 used for?

OUTDOOR LTE/WI-FI/GPS ANTENNA Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.