Part finder/Transistor, Photovoltaic Output Optoisolators/4N35
Transistor, Photovoltaic Output Optoisolators
Sourcing quote available

4N35

UMW

OPTOISO 5KV TRANS W/BASE 6-DIP

6-DIP (0.300", 7.62mm) Unknown Date-code options
MANUFACTURERUMW
AVAILABILITYIn stock
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICE$0.16 USD
QUANTITY3,000 units available
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

OPTOISO 5KV TRANS W/BASE 6-DIP The 4N35 from UMW is listed under Transistor, Photovoltaic Output Optoisolators with 6-DIP (0.300", 7.62mm) packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

22 verified engineering parameters recorded
Case/Package6-DIP (0.300", 7.62mm)
MountThrough Hole
Supplier Device Package6-DIP
Current - DC Forward (If) (Max)60 mA
Current - Output / Channel80mA
Current Transfer Ratio (Max)-
Current Transfer Ratio (Min)100% @ 10mA
Grade-
Input TypeDC
Number of Channels1
Operating Temperature-55°C ~ 110°C
Output TypeTransistor with Base
Product StatusActive
Qualification-
Rise / Fall Time (Typ)-
Series-
Turn On / Turn Off Time (Typ)10µs, 9µs
Vce Saturation (Max)300mV
Voltage - Forward (Vf) (Typ)1.24V
Voltage - Isolation5000Vrms
Voltage - Output (Max)80V
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about 4N35

What is 4N35 used for?

OPTOISO 5KV TRANS W/BASE 6-DIP Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.