Power Relays, Over 2 Amps
Sourcing quote available
789-536
WAGO Corporation
RELAY GEN PURPOSE 4PST 4A 24V
See datasheet Unknown Date-code options
MANUFACTURERWAGO Corporation
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Overview
The part, clearly identified.
RELAY GEN PURPOSE 4PST 4A 24V The 789-536 from WAGO Corporation is listed under Power Relays, Over 2 Amps with See datasheet packaging and a unknown lifecycle status. Contact us for pricing and availability.
Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record
Product attributes & parameters
24 verified engineering parameters recordedMountDIN Rail
Approval AgencyEAC
Coil Current12 mA
Coil Insulation-
Coil TypeNon Latching
Coil Voltage24VAC/DC
Contact Form4PST-2NO/2NC (2 Form A, 2 Form B)
Contact MaterialSilver Nickel (AgNi), Gold (Au)
Contact Rating (Current)4 A
FeaturesLighted Indicator
Grade-
Load - Max Switching1000VA
Must Operate Voltage-
Must Release Voltage-
Operate Time20 ms
Operating Temperature-25°C ~ 40°C
Product StatusActive
Qualification-
Relay TypeGeneral Purpose
Release Time20 ms
Seal Rating-
Switching Voltage250VAC - Max
Termination StyleSpring Terminal
LifecycleUnknown
Quality and documentation
Bring the evidence your project requires.
Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.
Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions
Common questions about 789-536
What is 789-536 used for?
RELAY GEN PURPOSE 4PST 4A 24V Contact Alamo if you need help validating the right package or alternate.
Can you confirm the available date code?
Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.
Is this part still in production?
The current record shows Unknown. Verification happens against the specific sourcing request.