Part finder/FET, MOSFET Arrays/RMD0A8P20ES9
FET, MOSFET Arrays
Sourcing quote available
RMD0A8P20ES9 by Rectron USA

RMD0A8P20ES9

Rectron USA

MOSFET 2P-CH 20V 0.8A SOT363-6L

6-TSSOP, SC-88, SOT-363 Unknown Date-code options
MANUFACTURERRectron USA
AVAILABILITYRequest to verify
LIFECYCLEUnknown
SHIPPING WITH
FEDEXDHLUPS
UNIT PRICERequest price
QUANTITYConfirm with RFQ
Fast RFQ

Request pricing & availability

PAYMENT METHODS
VISAMCAMEXPayPal
1. Share requirement2. Verify supply3. Confirm quote
Overview

The part, clearly identified.

MOSFET 2P-CH 20V 0.8A SOT363-6L The RMD0A8P20ES9 from Rectron USA is listed under FET, MOSFET Arrays with 6-TSSOP, SC-88, SOT-363 packaging and a unknown lifecycle status. Contact us for pricing and availability.

Verification included.Sourcing details are confirmed against your RFQ before response.
Technical record

Product attributes & parameters

19 verified engineering parameters recorded
Case/Package6-TSSOP, SC-88, SOT-363
MountSurface Mount
Supplier Device PackageSOT-363-6L
Configuration2 P-Channel (Dual)
Current - Continuous Drain (Id) @ 25°C800mA (Ta)
Drain to Source Voltage (Vdss)20V
FET Feature-
Gate Charge (Qg) (Max) @ Vgs0.0018C @ 4.5V
Grade-
Input Capacitance (Ciss) (Max) @ Vds87pF @ 10V
Operating Temperature-55°C ~ 150°C (TJ)
Power - Max800mW (Ta)
Product StatusActive
Qualification-
Rds On (Max) @ Id, Vgs1.2Ohm @ 500mA, 4.5V
Series-
TechnologyMOSFET (Metal Oxide)
Vgs(th) (Max) @ Id1V @ 250µA
LifecycleUnknown
Quality and documentation

Bring the evidence your project requires.

Share certificate, traceability, packaging, destination and date-code requirements in the RFQ so the sourcing response is useful, not just a price.

Certification references: AS6081 / RoHS / ISO 9001
Packaging and condition confirmed before quote
Shipping coordination through trusted carriers
Frequently asked questions

Common questions about RMD0A8P20ES9

What is RMD0A8P20ES9 used for?

MOSFET 2P-CH 20V 0.8A SOT363-6L Contact Alamo if you need help validating the right package or alternate.

Can you confirm the available date code?

Yes. Include your date-code preference in the RFQ and we will confirm it with the sourcing response.

Is this part still in production?

The current record shows Unknown. Verification happens against the specific sourcing request.